Mixing station network management requirements

Avoid soil, spoil venue. Avoid high voltage lines and tall trees. And communication lines to maintain a certain distance. Precast concrete plant possible away from the buildings built in the 20m, 300m away from centralized blasting area, 1 km away from the forest zone over the region. From the boiler room, generator room, kitchen and other temporary housing must be located no less than 10 m. Store flammable items should be specified in relation to the temporary storehouse safe distance away. 6 Construction interference, concrete mix plant  friendly and pollution treatment.A supply of concrete to improve efficiency, cost savings, concrete mixing station should be located close to the scene, while avoiding interference with the construction, should be selected in the central area of the concrete scope of supply.