Mixing station cleaning and storage of raw materials to be considered

Ample source material, and convenient transportation. For ease of sand and gravel, cement, fly ash, slag and other materials entering the transport, mixing station should be located conveniently close to the highway, according to the actual situation of the construction of the introduction of the address line. Three electric power, water and access to convenient, smooth communication, to meet the mixing station network management requirements. Four venues open flat area to meet the construction needs. Concrete batching plant consider cleaning and storage of raw materials, concrete mix, mixer layout, logistics channel, office and living areas, etc., site area should be sufficiently large and flat, open, to meet the production needs of the construction.  Concrete mixing plants from floods and landslides threaten to avoid landslides, rockfall, landslides, unstable rock and other locations. Avoid soil, spoil venue. Avoid high voltage lines and tall trees. And communication lines to maintain a certain distance. As far as possible away from the buildings built in the 20m, 300m away from centralized blasting area, 1 km away from the forest zone over the region. From the boiler room, generator room, kitchen and other temporary housing must be located no less than 10 m. Store flammable items should be specified in relation to the temporary storehouse safe distance away. 6 Construction interference, environmentally friendly and pollution treatment.

没有评论:

发表评论