Ready-mixed concrete is made of cement, aggregates, water and admixtures as required incorporation of mineral admixtures and other components by a certain percentage, in metered mixing station, mixing after the sale and use of vehicles, within the specified time shipped to the place of use of the concrete mixture.
2013年8月30日星期五
Easily damaged stirring mechanism
Electrical operation of both manual and automatic Auto: Set the switch to the automatic position 1K dial that automatically slow stirring 120 seconds, Stopped 10 seconds after the alarm for 5 seconds, 120 seconds and stirring action, and then automatically stop. When an automatic program ends, Precast concrete plant, then 1K Switch on automatically, and starts executing the next automatic process. Each automatic After the end of the program, you must switch to stop 1K prevent programmable controller after power outage Malfunction. Manual: 1K dial the switch to the manual position, and then the three switches set to 2K To slow, stop, fast stop position, respectively, precast concrete plant, artificial meter Time. Note: The three-phase power socket wiring must ensure that the direction of the machine blade revolution Body of the standard in the same direction, or vulnerable to damage stirring mechanism.
订阅:
博文评论 (Atom)
没有评论:
发表评论