Ready-mixed concrete is made of cement, aggregates, water and admixtures as required incorporation of mineral admixtures and other components by a certain percentage, in metered mixing station, mixing after the sale and use of vehicles, within the specified time shipped to the place of use of the concrete mixture.
2013年8月11日星期日
foreign plugging concrete delivery
In theory, the most prone to plugging in three large stones in the same section meet clamping, the time section occupied most of stones, negotiable area is very small.Stabilized Soil Mixing Plant maximum diameter and tube diameter gravel d: D <1:3 (Note: This is the "order" in the detailed provisions, according to the transport height and stones kind of 1:2.5 to 1:5), and the pump hopper located on the square grid, to prevent oversized stone in mixed. When passing 0.315mm sieve sand content is low, even if stationary concrete batching plant technical indicators are in line with requirements will be plugging. Because these sand in concrete balls from a similar role to reduce the friction with the concrete wall, to improve mobility in vain, increase the cohesion into water retention, pumpability of concrete greatly. Therefore JGJ/T10-95 "Technical Specification for Concrete Pumping" in the provisions of the sand through the 0.315mm sieve not less than 15%.
订阅:
博文评论 (Atom)
没有评论:
发表评论