Its structure is mostly upper material storage hopper, the lower part weighing hopper, bottom discharge conveyor belt, hopper with raw materials to be used for storage, storage hopper bottom port conveyor belt under the Founder right ingredients. The principle: the ingredients begin, start with a belt conveyor hopper to the set value in raw material belt is stopped, and then under the control of the Concrete batching plant, followed by configuration of several materials to all materials configured, instrumentation control will start unloading belt material into the next part (such as blenders enhance bucket or belt conveyor, etc.)
Multi-belt ingredient for small and medium sized construction site, because of its smaller base materials such as sand PL800 with 500Kg, press ≤ ± 2% error count, absolute error within the 0 ~ 20Kg, so as to further improve the batching accuracy, reduce errors value without compromising the efficiency of delivery, the ingredients can be slow, fast discharge mode. Error can be controlled within the 0 ~ 5Kg.
Users use such batching machine in order to reduce procurement costs, and more hope to borrow metering hopper concrete mixer machine to simultaneously measure bulk cement, cement screw conveyor through the cement into the cement silo batching machine weighing hopper, generally do not advocate this usage, Because cement fluidity, will cause the conveyor belt weighing hopper mouth with a small amount of cement gap overflow, causing loss of live or cement dust pollution, such as have to use this method you must use Groove belt roller and bucket lip additional soft thin wall in order to control the cement spill.
没有评论:
发表评论